Hello! Is it possible to do forward filling of CDF timeseries datapoints at second level? Example: I have a timeseries with values at certain timestamp as the tag is coming only on value change. But I want to forward fill the values to be able to analyze the tags better in PowerBI (this operation takes much time in PowerBI).
Check the
documentation
Ask the
Community
Take a look
at
Academy
Cognite
Status
Page
Contact
Cognite Support