As a user i would like the system to identify optimization opportunities (such as deferment reduction) for me through defined rules & logic or and aggent! e.g. if a maintenance and a WI job is scheduled for the same prod element within the two weeks this should be highlighted in Maintain to discuss if it can be combined at the same time!
Such that I can be notified about these opportunities without having to manually review the system (in the Cognite Maintain App)
After a joint discussion with Cognite
Check the
documentation
Ask the
Community
Take a look
at
Academy
Cognite
Status
Page
Contact
Cognite Support