Hello everyone,
I created a calculated timeseries based on an existing one and everything went well, except that the calculated timeseries does not have a linked asset. As a result, when I am looking at the asset on data fusion this calculation does not show up.
Did I miss something? Is there a way to link this calculated time series to the asset that I want?
Thank you.