Skip to main content

How to create faster and more efficient RCAs with Industrial Canvas

  • 5 September 2024
  • 0 replies
  • 35 views

Hi everyone,

I would like to share with you how to build faster your RCAs with Industrial Canvas. 

We have seen many of our users spend more time dealing with tools and data instead of focusing on the cause and analyzing the issues. We can facilitate this process and speed up your time to value. 


Now, in Industrial Canvas, you can easily create cause maps in the same workspace where you have all the data you need as evidence for approving/rejecting a hypothesis.  

The built-in cause map comes with a few essential features: 

  • Easily create a tree with cards. Option to add more connected cards by clicking on the “+” left, right, above, and below.
  • The boxes are automatically connected. Arrow pointing right to left.
  • Auto alignment: The user does not need to take actions for alignment.
  • If you move the root card, the entire tree also moves.
  • Boxes can be connected with other data in the canvas by using connection lines.
  • Multiple trees can be added to the same canvas and connected. 
  • Apply statuses on cards (e.g., if a hypothesis is rejected or approved).
Please watch this quick video to get a complete feel of how you can do it. 
 
 

Some users have already used it and seen its value. We are curious about your experience and happy to get thoughts and feedback from the community! 

Thank you,
Industrial Canvas team.
​​​​​​​

Be the first to reply!

Reply