Impact 2024: The Industrial Data and AI Conference for and by Users | Nominate Speakers Now for a Ch...
Hello, I am trying to perform a calculation on Charts but it does not work. It is a multiplication of 4 time series, all of them with a resample to granularity to 1m. One of them has real values and 3 of them are 0/1 steps. When I zoom out, I can see the calculation and it shows a pick of values, that is not accurate as it shows average data. Although when I zoon in to see the data, the trend disappears, the error says “One of the time series has less than two values”. As I resampled the data to 1 minute, I was expecting to see one values per minute, but it does not seems to happen. Is there other way to calculate the data correctly? Zoom in:
Hello, I would like to know what is the best way to plot two variables in a XxY chart instead of stacking them. For example: I have “variable A” and I want it on Y axis and “variable B” on X axis instead of timestamp. Is it possible to do it using Charts, Canvas or should I do it on Power BI?
Hello, I have a time series that accumulate values during the day and at 9pm it resets to zero. I am interested in creating a calculation to storage only the value every day at 9 pm in a new time series. I thought about Scheduling a Calculation on charts and schedule it to every day at 9 pm and run it to backfill, but it seems that there is no option. Also when I schedule a calculation and select to run every 1 day, it does not give the option to select time. Is it possible to schedule it to a specific time?Also is there a better way to do it?
Already have an account? Login
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.